Research Article | Open Access |

Apply Metaheuristic ANGEL to Schedule Multiple Projects with Resource-Constrained and Total Tardy Cost

Author 1: Shih-Chieh Chen Author 2: Ching-Chiuan Lin
International Journal of Advanced Computer Science and Applications (IJACSA) · Vol. 6, No. 3 · Published 2015

DOI: 10.14569/IJACSA.2015.060307

Abstract

In this paper the multiple projects resource-constrained project scheduling problem is considered. Several projects are to be scheduled simultaneously with sharing several kinds of limited resources in this problem. Each project contains non-preemptive and deterministic duration activities which compete limited resources under resources and precedence constraints. Moreover, there are the due date for each project and the tardy cost per day that cause the penalty when the project cannot be accomplished before its due date. The objective is to find the schedules of the considered projects to minimize the total tardy cost subject to the resource and precedence constraints. Since the resource-constrained project scheduling problem has been proven to be NP-Hard, we cannot find a deterministic algorithm to solve this problem efficiently and metaheuristics or evolutionary algorithms are developed for this problem instead. The problem considered in this paper is harder than the original problem because the due date and tardy cost of a project are considered in addition. The metaheuristic method called ANGEL was applied to this problem. ANGEL combines ant colony optimization (ACO), genetic algorithm (GA) and local search strategy. In ANGEL, ACO and GA run alternately and cooperatively. ANGEL performs very well in the multiple projects resource-constrained project scheduling problem as revealed by the experimental results.

Keywords

How to Cite this Article

Chen, S., & Lin, C. (2015). Apply Metaheuristic ANGEL to Schedule Multiple Projects with Resource-Constrained and Total Tardy Cost. International Journal of Advanced Computer Science and Applications, 6(3). https://doi.org/10.14569/IJACSA.2015.060307

Chen, Shih-Chieh, and Ching-Chiuan Lin. "Apply Metaheuristic ANGEL to Schedule Multiple Projects with Resource-Constrained and Total Tardy Cost." International Journal of Advanced Computer Science and Applications, vol. 6, no. 3, 2015, https://doi.org/10.14569/IJACSA.2015.060307.

@article{Chen2015,
  title     = {Apply Metaheuristic ANGEL to Schedule Multiple Projects with Resource-Constrained and Total Tardy Cost},
  journal   = {International Journal of Advanced Computer Science and Applications},
  volume    = {6},
  number    = {3},
  year      = {2015},
  publisher = {The Science and Information Organization},
  author    = {Shih-Chieh Chen and Ching-Chiuan Lin},
  doi       = {10.14569/IJACSA.2015.060307},
  url       = {https://doi.org/10.14569/IJACSA.2015.060307}
}

Open Access — licensed under a Creative Commons Attribution 4.0 International License. Unrestricted use, distribution, and reproduction in any medium, even commercially, as long as the original work is properly cited.

Call for Papers - Important Dates

Volume 17 No. 11, November 2026
Paper Submission Due October 25, 2026
Review Notification November 15, 2026
Publication Date November 30, 2026